T‑Mobile Polska centrum danych
T‑Mobile Polska centrum danych is an operational data center in Grzegórzki, Poland. Our footprint estimate of its power is about 2.1 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 2.1 MW (range 1 MW to 3.3 MW) Estimate from building footprint, low confidence. Footprint estimate: about 1,725 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 900 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 50.03940, 20.02447 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does T‑Mobile Polska centrum danych use?
We estimate the facility power at about 2.1 MW. Estimate from building footprint, low confidence.
Data centers near Grzegórzki
- Dabka Data Center 1.4 km
- Orange Polska // Kraków 6.1 km
- DISKUS Polska 6.5 km
- S-NET KRAKOW DATA CENTER KRDC-2 8.2 km
- Connected Krakow 8.7 km
- WNET DC Krakow 8.8 km
- AGH Cyfronet Helios 8.9 km · 0.5 MW
- Netia Data Center SOUL 9.4 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.