京阪奈データセンター
京阪奈データセンター is an operational data center in Sugai, Japan. Our footprint estimate of its power is about 8.8 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 8.8 MW (range 4.4 MW to 14 MW) Estimate from building footprint, low confidence. Footprint estimate: about 7,342 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 3,800 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 34.74148, 135.76637 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does 京阪奈データセンター use?
We estimate the facility power at about 8.8 MW. Estimate from building footprint, low confidence.
Data centers near Sugai
- NTT 180 m
- Colt 京阪奈データセンター 594 m · 57 MW
- KAGOYA データセンター B棟 1.8 km · 1.5 MW
- NTT 20.8 km
- KDDI data center in Osaka 21.9 km
- Digital Edge OSA1 - Osaka 22.2 km
- NTT Kitahama Data Center(Dojima Campus) 23.1 km
- NTT Docomo 24.0 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.