KAGOYA データセンター B棟
KAGOYA データセンター B棟 is an operational data center operated by カゴヤ・ジャパン株式会社 in Sugai, Japan. Our footprint estimate of its power is about 1.5 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | カゴヤ・ジャパン株式会社 |
| Facility power | 1.5 MW (range 0.8 MW to 2.4 MW) Estimate from building footprint, low confidence. Footprint estimate: about 1,265 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 640 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Also known as | KAGOYA データセンター A棟 |
| Coordinates | 34.74821, 135.78465 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does KAGOYA データセンター B棟 use?
We estimate the facility power at about 1.5 MW. Estimate from building footprint, low confidence.
Who operates KAGOYA データセンター B棟?
カゴヤ・ジャパン株式会社.
Data centers near Sugai
- 京阪奈データセンター 1.8 km · 8.8 MW
- Colt 京阪奈データセンター 1.8 km · 57 MW
- NTT 2.0 km
- NTT 20.8 km
- KDDI data center in Osaka 23.7 km
- NTT 23.8 km
- Digital Edge OSA1 - Osaka 24.0 km
- NTT Kitahama Data Center(Dojima Campus) 24.8 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.