Data Center Directory

Southgate Melbourne

Southgate Melbourne is an operational AI data center operated by Firmus in Melbourne, Australia. Its power is about 57 MW. Epoch AI estimates about 46,000 H100-equivalent AI chips (B300).

Key facts

StatusOperational
OperatorFirmus
Facility power57 MW
Reported (Epoch AI or owner data)
IT power41 MW
AI compute46,000 H100-equivalents
AI chipsB300
Reported (Epoch AI or owner data)
GPU capacity if all AIabout 23,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Capital costUSD 1.6 billion
Epoch AI estimate, 2025 USD.
Coordinates-37.82536, 144.96402 (city level)

Build timeline

DatePowerH100eWhat the satellite images and filings show
2022-12-2600Building 1 site is cleared/vacant land; no construction visible yet (based on Google Earth historical imagery).
2025-10-2800Satellite imagery shows 30 fully installed air-cooled chillers (20 fans each) on the roof, with room for many more. In the same month, Firmus [reported](https://firmus.co/newsroom/southgate-expansion) that Project Southgate's "first stages are under construction in Tasmania and Melbourne". So we don't think the Southgate part of the building is operational yet.
2026-05-1100Building 1's cooling capacity increased to 53 air-cooled chillers (20 fans each), up from 30 in Oct 2025. This is more than enough for the announced 18,400 GB300 GPUs, but construction does not quite look complete, so we expect another 3 months until it's operational.
2026-08-0957 MW46,000Building 1 is operational (estimate). No additional chip deployment beyond the 18,400 GB300 GPUs has been publicly confirmed, so we continue to report the disclosed capacity allocated to Project Southgate, rather than speculate on further buildout.

Source: Epoch AI Frontier Data Centers.

Chip deployments

DateChipUnitsBasis
2026-08-09B30018,400Reported

Satellite view

Questions

How much power does Southgate Melbourne use?

Public data puts the facility power at about 57 MW. Reported (Epoch AI or owner data).

What chips does Southgate Melbourne use?

Reported chips: B300.

Who operates Southgate Melbourne?

Firmus.

Data centers near Melbourne

More Firmus data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.