Data Center Directory

Equinix ME5 - Melbourne (formerly Metronode Melbourne 1)

Equinix ME5 - Melbourne (formerly Metronode Melbourne 1) is an operational data center operated by Equinix in Melbourne, Australia. Our footprint estimate of its power is about 2.3 MW.

Key facts

StatusOperational
OperatorEquinix
Facility power2.3 MW (range 1.2 MW to 3.7 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 1,923 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 980 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks6 networks, 2 internet exchanges
PeeringDB.
Also known asEquinix ME5
Address22-36 Walsh Street, West Melbourne
Coordinates-37.80794, 144.95354
Websiteequinix.com/locations/australia-colocation/melbourne-data-centers/me5

Satellite view

Questions

How much power does Equinix ME5 - Melbourne (formerly Metronode Melbourne 1) use?

We estimate the facility power at about 2.3 MW. Estimate from building footprint, low confidence.

Who operates Equinix ME5 - Melbourne (formerly Metronode Melbourne 1)?

Equinix.

Data centers near Melbourne

More Equinix data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.