ServerHouse F2 is an operational data center operated by ServerHouse in Fareham, United Kingdom. Our footprint estimate of its power is about 4.4 MW.

Key facts

StatusOperational
OperatorServerHouse
Facility power4.4 MW (range 2.2 MW to 7.1 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 3,697 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 1,900 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks2 networks
PeeringDB.
Also known asAstrohouse · Serverhouse
Address14 Brunel Way, Fareham
Coordinates50.86774, -1.24561
Websiteserverhouse.co.uk

Satellite view

Questions

How much power does ServerHouse F2 use?

We estimate the facility power at about 4.4 MW. Estimate from building footprint, low confidence.

Who operates ServerHouse F2?

ServerHouse.

Data centers near Fareham

More ServerHouse data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.