Regit4u

Regit4u is an operational data center in Hedge End, United Kingdom. Our footprint estimate of its power is about 0.6 MW.

Key facts

StatusOperational
Facility power0.6 MW (range 0.3 MW to 1 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 500 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 260 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates50.90674, -1.25002

Satellite view

Questions

How much power does Regit4u use?

We estimate the facility power at about 0.6 MW. Estimate from building footprint, low confidence.