Roller Network (Reno, NV)
Roller Network (Reno, NV) is an operational data center operated by Roller Network in Reno, United States. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Roller Network |
| Networks | 6 networks, 1 internet exchanges PeeringDB. |
| Address | 3545 Airway Dr. Suite 114 |
| Coordinates | 39.46931, -119.76983 |
| Website | rollernet.us |
Power and grid
| Utility | Sierra Pacific Power Co (investor owned) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | NEVP |
| Nearest gas pipeline | Paiute Pipeline Co, intrastate pipeline, 6.6 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 326 g CO₂ per kWh (Nevada, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 48.3%, solar 33.6%, other renewables 8.2%, coal 5.5%, hydro 4%. Clean power: 46.7% |
| Industrial power price | USD 0.102 per kWh (Nevada, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 8.9 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38.3 °C (2001 to 2025) |
| Cooling degree days | 306 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.23 kWh per m² per day |
| Wind at 50 m | 4.2 m/s average |
| Water stress today | High (40-80%) (Nevada) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How clean is the power for Roller Network (Reno, NV)?
The grid in Nevada emits about 326 g CO₂ per kWh (2025). Largest sources: gas 48.3%, solar 33.6%, other renewables 8.2%.
Who operates Roller Network (Reno, NV)?
Roller Network.
Data centers near Reno
- 200 South Virginia - Reno 7.0 km
- Data center in Spanish Springs 21.8 km · 13 MW
- Data center in Spanish Springs 21.9 km · 42 MW
- Data center in Spanish Springs 22.1 km · 13 MW
- Data center in Spanish Springs 22.3 km · 13 MW
- Apple Reno Data Center 22.6 km · 250 MW
- Data center in Spanish Springs 23.0 km · 15 MW
- Tahoe Reno 2 25.0 km · 26 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.