Restore Records Management
Restore Records Management is an operational data center in Horley, United Kingdom. Our footprint estimate of its power is about 15 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 15 MW (range 7.7 MW to 25 MW) Estimate from building footprint, low confidence. Footprint estimate: about 12,806 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 6,400 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 51.19891, -0.16426 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Restore Records Management use?
We estimate the facility power at about 15 MW. Estimate from building footprint, low confidence.
Data centers near Horley
- Unit 2 5.4 km · 3.6 MW
- Navisite Redhill UK 5.4 km · 12 MW
- 4D Gatwick (Crawley) 7.4 km · 1.4 MW
- Digital Realty LGW15 8.0 km · 12 MW
- Goldman Sachs data center in East Grinstead 11.1 km · 11 MW
- Pulsant Croydon LN-1 17.5 km · 4.5 MW
- Segro Croydon (Morgan Stanley) 20.7 km · 24 MW
- Croydon 20.8 km · 11 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.