Goldman Sachs data center in East Grinstead

Goldman Sachs data center in East Grinstead is an operational data center operated by Goldman Sachs in East Grinstead, United Kingdom. Our footprint estimate of its power is about 11 MW.

Key facts

StatusOperational
OperatorGoldman Sachs
Facility power11 MW (range 5.3 MW to 17 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 8,809 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 4,700 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressHills Road, RH19 1XZ, East Grinstead
Coordinates51.13546, -0.04199

Satellite view

Questions

How much power does Goldman Sachs data center in East Grinstead use?

We estimate the facility power at about 11 MW. Estimate from building footprint, low confidence.

Who operates Goldman Sachs data center in East Grinstead?

Goldman Sachs.

Data centers near East Grinstead

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.