Pure DC Madrid Meco (MAD01)

Pure DC Madrid Meco (MAD01) is a data center under construction operated by Pure DC in Meco, Spain. Our footprint estimate of its power is about 4.5 MW.

Key facts

StatusUnder construction
OperatorPure DC
Facility power4.5 MW (range 1.8 MW to 11 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 37,154 m² site outline x 0.12 kW per m² of land.
GPU capacity if all AIabout 1,900 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates40.53204, -3.31298

Satellite view

Questions

How much power does Pure DC Madrid Meco (MAD01) use?

We estimate the facility power at about 4.5 MW. Estimate from building footprint, low confidence.

Who operates Pure DC Madrid Meco (MAD01)?

Pure DC.