Data Center Directory

PenDC Data Center Solutions

PenDC Data Center Solutions is an operational data center operated by PenDC Data Center Solutions in Demirtaş, Türkiye. Our footprint estimate of its power is about 1.8 MW.

Key facts

StatusOperational
OperatorPenDC Data Center Solutions
Facility power1.8 MW (range 0.9 MW to 2.9 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 1,496 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 770 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Addressİstanbul Caddesi 750
Coordinates40.30897, 29.06397
Websitependc.com

Satellite view

Questions

How much power does PenDC Data Center Solutions use?

We estimate the facility power at about 1.8 MW. Estimate from building footprint, low confidence.

Who operates PenDC Data Center Solutions?

PenDC Data Center Solutions.

Data centers near Demirtaş

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.