Star of Bosphorus Veri Merkezi
Star of Bosphorus Veri Merkezi is an operational data center operated by NGN in Tuzla, Türkiye. Our footprint estimate of its power is about 28 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | NGN |
| Facility power | 28 MW (range 14 MW to 45 MW) Estimate from building footprint, low confidence. Footprint estimate: about 23,569 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 12,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Hidayet Caddesi, Tuzla |
| Coordinates | 40.89131, 29.40306 |
| Website | starofbosphorus.com.tr |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Star of Bosphorus Veri Merkezi use?
We estimate the facility power at about 28 MW. Estimate from building footprint, low confidence.
Who operates Star of Bosphorus Veri Merkezi?
NGN.
Data centers near Tuzla
- Turkcell Gebze Veri Merkezi 8.3 km · 21 MW
- Kaynarca Santrali 11.2 km · 0.9 MW
- Turkcell Kartal Veri Merkezi 16.2 km · 3.6 MW
- Equinix IL2 - Istanbul 22.2 km
- Kuzey Veri Merkezi 24.0 km
- Equinix IL4 - Istanbul 24.5 km
- Yöncü Bilişim Çözümleri 24.6 km
- Teknotel - Kucukyali 25.2 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.