Oracle Batam is an operational AI data center operated by Oracle in Batam, Indonesia. Its power is about 94 MW. Epoch AI estimates about 84,000 H100-equivalent AI chips (B200, B300).
Key facts
| Status | Operational |
|---|---|
| Operator | Oracle |
| Users | Tencent (speculative) |
| Facility power | 94 MW Reported (Epoch AI or owner data) |
| IT power | 72 MW |
| AI compute | 84,000 H100-equivalents |
| AI chips | B200, B300 Reported (Epoch AI or owner data) |
| GPU capacity if all AI | about 40,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Capital cost | USD 2.7 billion Epoch AI estimate, 2025 USD. |
| Coordinates | 1.10308, 104.03837 (city level) |
Build timeline
| Date | Power | H100e | What the satellite images and filings show |
|---|---|---|---|
| 2022-07-01 | 0 | 0 | Land clearing begins. |
| 2025-05-15 | 43 MW | 40,000 | Building 1 and 2 are operational. Based on Oracle [announcing](https://docs.oracle.com/en-us/iaas/releasenotes/oci/new-region-batam.htm) the Indonesia North (Batam) region is available, and both buildings looking complete soon after, in June. |
| 2025-06-13 | 43 MW | 40,000 | Building 3 shell is partly built. Building 1 and 2 look complete. |
| 2025-10-01 | 43 MW | 40,000 | Building 3 has cooling towers beginning to be installed. |
| 2026-03-19 | 43 MW | 40,000 | Building 3 looks complete including building shell, chillers and backup generators. |
| 2026-04-17 | 94 MW | 84,000 | Building 3 is operational. Based on it looking complete as of March, and DayOne [posting](https://www.linkedin.com/posts/dayonedc-datacenter-batam-ugcPost-7450899048925986816-Wxqu/) a video of the facility on this date. In one shot of the video, fan movement is visible for all buildings, suggesting they are all operational. |
| 2026-05-06 | 94 MW | 84,000 | The three buildings look unchanged since March. |
Source: Epoch AI Frontier Data Centers.
Chip deployments
| Date | Chip | Units | Basis |
|---|---|---|---|
| 2025-05-15 | B200 | 15,999 | Estimate |
| 2026-04-17 | B300 | 17,397 | Estimate |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Oracle Batam use?
Public data puts the facility power at about 94 MW. Reported (Epoch AI or owner data).
What chips does Oracle Batam use?
Reported chips: B200, B300.
Who operates Oracle Batam?
Oracle. Reported users: Tencent.
Data centers near Batam
- BatamIX 2.1 km
- Biznet BigPOP Batam Sungai Panas 2.8 km
- Biznet BigPOP Batam Graha Pena 2.9 km
- neuCentrIX - Batam 3.6 km
- IDC Batam 3.8 km
- Matrix Data Center BM1 (MDC BM1) 12.9 km
- Singtel Bedok Data Center 26.9 km
- 1-Net East 27.7 km
More Oracle data centers
- OpenAI Stargate New Mexico United States
- OpenAI Stargate Shackelford United States
- OpenAI Stargate Michigan United States
- OpenAI Stargate Wisconsin United States
- OpenAI Stargate Abilene United States
Sources
- Epoch AI, Frontier Data Centers
- DayOne discloses a partnership with "leading global tech company" at their Batam campus
- Oracle announces their Batam cloud compute region
- Oracle is later reported to be leasing DayOne data centers in Indonesia
- DayOne video stating 72 MW of IT power and NVIDIA partnership, and showing cooling tower fan movement
- Tencent deal with Oracle for 100,000 AI chips in Southeast Asian data centers
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.