Oracle Batam

Oracle Batam is an operational AI data center operated by Oracle in Batam, Indonesia. Its power is about 94 MW. Epoch AI estimates about 84,000 H100-equivalent AI chips (B200, B300).

Key facts

StatusOperational
OperatorOracle
UsersTencent (speculative)
Facility power94 MW
Reported (Epoch AI or owner data)
IT power72 MW
AI compute84,000 H100-equivalents
AI chipsB200, B300
Reported (Epoch AI or owner data)
GPU capacity if all AIabout 40,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Capital costUSD 2.7 billion
Epoch AI estimate, 2025 USD.
Coordinates1.10308, 104.03837 (city level)

Build timeline

DatePowerH100eWhat the satellite images and filings show
2022-07-0100Land clearing begins.
2025-05-1543 MW40,000Building 1 and 2 are operational. Based on Oracle [announcing](https://docs.oracle.com/en-us/iaas/releasenotes/oci/new-region-batam.htm) the Indonesia North (Batam) region is available, and both buildings looking complete soon after, in June.
2025-06-1343 MW40,000Building 3 shell is partly built. Building 1 and 2 look complete.
2025-10-0143 MW40,000Building 3 has cooling towers beginning to be installed.
2026-03-1943 MW40,000Building 3 looks complete including building shell, chillers and backup generators.
2026-04-1794 MW84,000Building 3 is operational. Based on it looking complete as of March, and DayOne [posting](https://www.linkedin.com/posts/dayonedc-datacenter-batam-ugcPost-7450899048925986816-Wxqu/) a video of the facility on this date. In one shot of the video, fan movement is visible for all buildings, suggesting they are all operational.
2026-05-0694 MW84,000The three buildings look unchanged since March.

Source: Epoch AI Frontier Data Centers.

Chip deployments

DateChipUnitsBasis
2025-05-15B20015,999Estimate
2026-04-17B30017,397Estimate

Satellite view

Questions

How much power does Oracle Batam use?

Public data puts the facility power at about 94 MW. Reported (Epoch AI or owner data).

What chips does Oracle Batam use?

Reported chips: B200, B300.

Who operates Oracle Batam?

Oracle. Reported users: Tencent.

Data centers near Batam

More Oracle data centers

Sources