O
O is an operational data center in Etterbeek, Belgium. Our footprint estimate of its power is about 0.9 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 0.9 MW (range 0.4 MW to 1.4 MW) Estimate from building footprint, low confidence. Footprint estimate: about 717 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 380 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 50.81480, 4.38349 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does O use?
We estimate the facility power at about 0.9 MW. Estimate from building footprint, low confidence.
Data centers near Etterbeek
- VERIXI Louise DC 1.4 km
- Level(3) Brussels 5.2 km · 5.9 MW
- Woluwedal 102 6.2 km
- Proximus Netcenter 7.2 km
- DC Evere 7.3 km
- brusselsdc 8.9 km · 1.3 MW
- Digital Realty BRU1 - Brussels 9.0 km · 9.6 MW
- MCI/Verizon Brussels (Diegem) E 9.1 km
Sources
Correct this page or get the data