Data Center Directory

brusselsdc

brusselsdc is an operational data center operated by Datacenter United in Zaventem, Belgium. Our footprint estimate of its power is about 1.3 MW.

Key facts

StatusOperational
OperatorDatacenter United
Facility power1.3 MW (range 0.7 MW to 2.1 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 545 m² building outline x 2 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 560 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks16 networks, 1 internet exchanges
PeeringDB.
Also known asBrussels DC
AddressExcelsiorlaan 15
Coordinates50.88145, 4.45416
Websitedatacenterunited.com/brussels-dc

Satellite view

Questions

How much power does brusselsdc use?

We estimate the facility power at about 1.3 MW. Estimate from building footprint, low confidence.

Who operates brusselsdc?

Datacenter United.

Data centers near Zaventem

More Datacenter United data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.