NorthC Munich 2
NorthC Munich 2 is an operational data center operated by NorthC Deutschland in Munich, Germany. Our footprint estimate of its power is about 7.3 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | NorthC Deutschland |
| Facility power | 7.3 MW (range 3.7 MW to 12 MW) Estimate from building footprint, low confidence. Footprint estimate: about 6,107 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 3,100 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 20 networks, 1 internet exchanges PeeringDB. |
| Also known as | NorthC München 2 |
| Address | Wamslerstrasse 8 |
| Coordinates | 48.13597, 11.66274 |
| Website | northcdatacenters.com/de |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does NorthC Munich 2 use?
We estimate the facility power at about 7.3 MW. Estimate from building footprint, low confidence.
Who operates NorthC Munich 2?
NorthC Deutschland.
Data centers near Munich
- Equinix MU4 - Munich, Dornach 1.9 km · 1.9 MW
- NorthC München 1 4.9 km
- NorthC Munich 1 5.0 km
- WIIT Datacenter MUC8 5.0 km
- Telekom Data-Center 5.1 km · 29 MW
- noris network datacenter.de MUC5 5.9 km
- noris Munich MUC5 6.2 km · 5.5 MW
- NTT Munich 1 Data Center (MUC1) 6.5 km
More NorthC Deutschland data centers
- NorthC Hamburg Germany
- NorthC Berlin Germany
- NorthC Duesseldorf Germany
- NorthC Frankfurt 3 Germany
- NorthC Munich 1 Germany
- NorthC Nürnberg Germany
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.