noris Munich MUC5
noris Munich MUC5 is an operational data center operated by noris in Feldkirchen, Germany. Our footprint estimate of its power is about 5.5 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | noris |
| Facility power | 5.5 MW (range 2.2 MW to 14 MW) Estimate from building footprint, low confidence. Footprint estimate: about 45,905 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 2,400 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 48.16129, 11.73768 |
| Website | noris.de/en/data-centers/dc-munich-east |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does noris Munich MUC5 use?
We estimate the facility power at about 5.5 MW. Estimate from building footprint, low confidence.
Who operates noris Munich MUC5?
noris.
Data centers near Feldkirchen
- noris network datacenter.de MUC5 389 m
- NTT Munich 1 Data Center (MUC1) 1.5 km
- Portus MUC1 2.3 km
- Equinix MU4 - Munich, Dornach 4.4 km · 1.9 MW
- WIIT Datacenter MUC8 6.0 km
- NorthC Munich 2 6.2 km · 7.3 MW
- Data center in Unterföhring 7.9 km · 2.3 MW
- Telekom Data-Center 10.4 km · 29 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.