NORD-4 is an operational data center operated by DataLine in Novokhovrino, Russia. Our footprint estimate of its power is about 5.2 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | DataLine |
| Facility power | 5.2 MW (range 2.6 MW to 8.3 MW) Estimate from building footprint, low confidence. Footprint estimate: about 4,310 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 2,200 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Also known as | NORD-5 · NORD-1 · NORD-2 · NORD-3 |
| Address | Коровинское шоссе 41 с8 |
| Coordinates | 55.88656, 37.51336 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does NORD-4 use?
We estimate the facility power at about 5.2 MW. Estimate from building footprint, low confidence.
Who operates NORD-4?
DataLine.
Data centers near Novokhovrino
- Data center in Novokhovrino 213 m · 3.1 MW
- IXcellerate MOS1 4.8 km · 21 MW
- 3data A35 5.0 km
- DataPro Moscow II 5.0 km · 1.8 MW
- e-Style ISP LLC 5.1 km
- IXcellerate MOS2 6.5 km
- Web Data Center 6.7 km
- Rostelecom Moscow-V 7.2 km · 29 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.