NORD-4

NORD-4 is an operational data center operated by DataLine in Novokhovrino, Russia. Our footprint estimate of its power is about 5.2 MW.

Key facts

StatusOperational
OperatorDataLine
Facility power5.2 MW (range 2.6 MW to 8.3 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 4,310 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 2,200 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Also known asNORD-5 · NORD-1 · NORD-2 · NORD-3
AddressКоровинское шоссе 41 с8
Coordinates55.88656, 37.51336

Satellite view

Questions

How much power does NORD-4 use?

We estimate the facility power at about 5.2 MW. Estimate from building footprint, low confidence.

Who operates NORD-4?

DataLine.