IXcellerate MOS1
IXcellerate MOS1 is an operational data center operated by IXcellerate in Moscow, Russia. Our footprint estimate of its power is about 21 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | IXcellerate |
| Facility power | 21 MW (range 10 MW to 33 MW) Estimate from building footprint, low confidence. Footprint estimate: about 8,721 m² building outline x 2 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 9,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 41 networks, 6 internet exchanges PeeringDB. |
| Also known as | IXcellerate North MOS 2 · IXcellerate North MOS 1 · IXcellerate North MOS 3 · IXcellerate North MOS 4 |
| Address | Altufievskoe shosse 33G |
| Coordinates | 55.86235, 37.57740 |
| Website | ixcellerate.com/data-centers/moscow-north-campus/#mos1 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does IXcellerate MOS1 use?
We estimate the facility power at about 21 MW. Estimate from building footprint, low confidence.
Who operates IXcellerate MOS1?
IXcellerate.
Data centers near Moscow
- 3data A35 400 m
- IXcellerate MOS2 2.0 km
- e-Style ISP LLC 3.2 km
- Rostelecom Moscow-V 4.1 km · 29 MW
- NORD-4 4.8 km · 5.2 MW
- Data center in Novokhovrino 4.9 km · 3.1 MW
- Stack.HTH 6.0 km
- Tech.ru DC2 6.3 km
More IXcellerate data centers
- IXcellerate South MOS5 Russia
- IXcellerate MOS2 Russia
- IXcellerate MOS5 Russia
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.