Data Center Directory

nLighten Paris PAR3

nLighten Paris PAR3 is an operational data center operated by nLighten HQ in Paris, France. Our footprint estimate of its power is about 1.5 MW.

Key facts

StatusOperational
OperatornLighten HQ
Facility power1.5 MW (range 0.7 MW to 2.4 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 1,237 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 640 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Also known asDatacenter Oxya
Address12 Rue Vladimir Jankelevitch
Coordinates48.82926, 2.58732
Websitenlighten.com/en/edge-location/paris-3

Satellite view

Questions

How much power does nLighten Paris PAR3 use?

We estimate the facility power at about 1.5 MW. Estimate from building footprint, low confidence.

Who operates nLighten Paris PAR3?

nLighten HQ.

Data centers near Paris

More nLighten HQ data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.