NJDC2 - 300 J F Kennedy Blvd is an operational data center operated by Colocation America in Secaucus, United States. Our footprint estimate of its power is about 64 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Colocation America |
| Facility power | 64 MW (range 32 MW to 103 MW) Estimate from building footprint, low confidence. Footprint estimate: about 53,613 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 27,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Also known as | Equinix New York Secaucus NY2 |
| Address | 275 Hartz Way |
| Coordinates | 40.77782, -74.07591 |
| Website | colocationamerica.com/data-center-locations/new-jersey.htm |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does NJDC2 - 300 J F Kennedy Blvd use?
We estimate the facility power at about 64 MW. Estimate from building footprint, low confidence.
Who operates NJDC2 - 300 J F Kennedy Blvd?
Colocation America.
Data centers near Secaucus
- Equinix NY2/NY4/NY5/NY6 - New York, Secaucus 319 m · 29 MW
- Equinix NY3 - New York, Secaucus 725 m · 9.2 MW
- H5 Data Centers Secaucus (NJ01) 779 m
- H5 Secaucus 846 m
- InterServer Teb2 934 m
- Centersquare New Jersey (EWR5) 1.1 km · 21 MW
- CoreSite - Secaucus (NY2) 1.2 km · 5.8 MW
- Evocative EWR1 1.3 km · 17 MW
More Colocation America data centers
- PDC1 - 9999 Hamilton blvd United States
- PDC2 - 1000 Adams ave United States
- BDC1 - 34 Saint Martin Dr United States
- CDC4 - 1808 Swift Dr United States
- HDC1 - 108 Bank St United States
- LADC5 - 650 S Grand Ave United States
- PDC3 - 3949 Schelden Cir United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.