Netia Data Center MIND
Netia Data Center MIND is an operational data center operated by Netia in Jawczyce, Poland. Our footprint estimate of its power is about 0.7 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Netia |
| Facility power | 0.7 MW (range 0.3 MW to 1.8 MW) Estimate from building footprint, low confidence. Footprint estimate: about 5,922 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 300 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 10 networks, 1 internet exchanges PeeringDB. |
| Also known as | Netia MIND Data Center |
| Address | Sadowa 5 |
| Coordinates | 52.21077, 20.84880 |
| Website | netia.pl/en/operators/produkty/infrastructure/data-center |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Netia Data Center MIND use?
We estimate the facility power at about 0.7 MW. Estimate from building footprint, low confidence.
Who operates Netia Data Center MIND?
Netia.
Data centers near Jawczyce
- Data4 Pologne WAW2 109 m · 1.1 MW
- Data 4 Warszawy 148 m · 1.4 MW
- EdgeConneX Warsaw (EDCWAW03) 2.6 km
- OVHcloud Ożarów (WAW-1) 2.8 km · 8.9 MW
- ATMAN Data Center Warsaw-3 (WAW-3, Ożarowska 66B) 3.0 km · 7.8 MW
- Equinix WA3 - Warsaw 5.4 km · 1.7 MW
- Datahouse Warsaw 5.5 km
- EdgeConneX Warsaw (EDCWAW02) 6.6 km
More Netia data centers
- Netia Data Center BRAIN Poland
- Netia Data Center HEART Poland
- Netia Data Center SOUL Poland
- Netia Jaworzno (JAWOH001) Poland
- Netia Poznań (POZNH003) Poland
- Netia Warsaw (WARSC001) Poland
- TKTelekom - Joanitow Poland
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.