Equinix WA3 - Warsaw is an operational data center operated by Equinix in Warsaw, Poland. Our footprint estimate of its power is about 1.7 MW.

Key facts

StatusOperational
OperatorEquinix
Facility power1.7 MW (range 0.7 MW to 4.2 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 14,147 m² site outline x 0.12 kW per m² of land.
GPU capacity if all AIabout 730 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks32 networks, 4 internet exchanges
PeeringDB.
Also known asEquinix WA3
Address217 al. Jerozolimskie
Coordinates52.18997, 20.92074
Websiteequinix.com/locations/europe-colocation/poland-colocation/warsaw-data-centers/wa3

Satellite view

Questions

How much power does Equinix WA3 - Warsaw use?

We estimate the facility power at about 1.7 MW. Estimate from building footprint, low confidence.

Who operates Equinix WA3 - Warsaw?

Equinix.