MEVSPACE DC-1 is an operational data center operated by Mevspace sp. z o.o. in Wyszków, Poland. Our footprint estimate of its power is about 1.4 MW.

Key facts

StatusOperational
OperatorMevspace sp. z o.o.
Facility power1.4 MW (range 0.6 MW to 3.5 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 11,664 m² site outline x 0.12 kW per m² of land.
GPU capacity if all AIabout 600 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks15 networks
PeeringDB.
Also known asDC Mevspace 1
Addressul.Serwerowa 10
Coordinates52.61294, 21.42777
Websitemevspace.com

Power and grid

Grid carbon intensity591 g CO₂ per kWh (Poland, 2025)
Average of all power made in the area. Ember.
Grid power mixcoal 50.6%, gas 14.4%, wind 13.9%, solar 11.3%, bioenergy 4.9%. Clean power: 31.2%
Industrial power priceEUR 0.169 per kWh (Poland, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Water stress todayLow - Medium (10-20%) (Poland)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does MEVSPACE DC-1 use?

We estimate the facility power at about 1.4 MW. Estimate from building footprint, low confidence.

How clean is the power for MEVSPACE DC-1?

The grid in Poland emits about 591 g CO₂ per kWh (2025). Largest sources: coal 50.6%, gas 14.4%, wind 13.9%.

Who operates MEVSPACE DC-1?

Mevspace sp. z o.o..

Data centers near Wyszków

More Mevspace sp. z o.o. data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.