DC 11.11
DC 11.11 is an operational data center operated by NASK in Warszawa, Poland. Our footprint estimate of its power is about 1.2 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | NASK |
| Facility power | 1.2 MW (range 0.6 MW to 2 MW) Estimate from building footprint, low confidence. Footprint estimate: about 1,022 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 510 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | 11 Listopada 23A, 03-446, Warszawa |
| Coordinates | 52.26578, 21.03694 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does DC 11.11 use?
We estimate the facility power at about 1.2 MW. Estimate from building footprint, low confidence.
Who operates DC 11.11?
NASK.
Data centers near Warszawa
- 3S Data Center Warsaw 4.1 km
- Orange Polska / Warsaw św. Barbary 10 4.7 km
- LIM Warsaw 4.8 km
- Equinix WA1 - Warsaw, Centrum LIM 4.8 km
- Netia Warsaw (WARSC001) 4.9 km
- T-Mobile Piękna 4.9 km
- EdgeConneX Warsaw (EDCWAW01) 5.0 km
- T-Mobile Warszawa-Szlachecka 5.6 km · 5.9 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.