MERLIN Edged BIL03 - Bilbao-Arasur is an operational data center operated by MERLIN Edged in Rivabellosa, Spain. Our footprint estimate of its power is about 36 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | MERLIN Edged |
| Facility power | 36 MW (range 18 MW to 58 MW) Estimate from building footprint, low confidence. Footprint estimate: about 10,122 m² building outline x 3 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 15,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 1 networks PeeringDB. |
| Also known as | Data Center Bilbao Arasur |
| Address | Avenida Ribera Baja S/N |
| Coordinates | 42.69831, -2.91050 |
| Website | edged.es/bilbao-arasur |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does MERLIN Edged BIL03 - Bilbao-Arasur use?
We estimate the facility power at about 36 MW. Estimate from building footprint, low confidence.
Who operates MERLIN Edged BIL03 - Bilbao-Arasur?
MERLIN Edged.
Data centers near Rivabellosa
- Data Center 2 Bilbao Arasur 251 m · 61 MW
- Data center in Miranda de Ebro 583 m
- EXA Edge DC Basauri 59.1 km
- Mozoilo AJVP 60.5 km
- Telxius Derio DC 66.6 km
- Data center in Zamudio 66.9 km · 2.2 MW
- Ibercom San Sebastian 99.0 km
More MERLIN Edged data centers
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.