MERLIN Edged BIL03 - Bilbao-Arasur is an operational data center operated by MERLIN Edged in Rivabellosa, Spain. Our footprint estimate of its power is about 36 MW.

Key facts

StatusOperational
OperatorMERLIN Edged
Facility power36 MW (range 18 MW to 58 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 10,122 m² building outline x 3 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 15,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks1 networks
PeeringDB.
Also known asData Center Bilbao Arasur
AddressAvenida Ribera Baja S/N
Coordinates42.69831, -2.91050
Websiteedged.es/bilbao-arasur

Satellite view

Questions

How much power does MERLIN Edged BIL03 - Bilbao-Arasur use?

We estimate the facility power at about 36 MW. Estimate from building footprint, low confidence.

Who operates MERLIN Edged BIL03 - Bilbao-Arasur?

MERLIN Edged.