Data Center 2 Bilbao Arasur is an operational data center operated by Merlin Properties in Miranda de Ebro, Spain. Our footprint estimate of its power is about 61 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Merlin Properties |
| Facility power | 61 MW (range 31 MW to 98 MW) Estimate from building footprint, low confidence. Footprint estimate: about 16,985 m² building outline x 3 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 26,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Also known as | Data Center 3 Bilbao Arasur |
| Coordinates | 42.69876, -2.90748 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Data Center 2 Bilbao Arasur use?
We estimate the facility power at about 61 MW. Estimate from building footprint, low confidence.
Who operates Data Center 2 Bilbao Arasur?
Merlin Properties.
Data centers near Miranda de Ebro
- MERLIN Edged BIL03 - Bilbao-Arasur 251 m · 36 MW
- Data center in Miranda de Ebro 332 m
- EXA Edge DC Basauri 59.0 km
- Mozoilo AJVP 60.5 km
- Telxius Derio DC 66.6 km
- Data center in Zamudio 66.8 km · 2.2 MW
- Ibercom San Sebastian 98.8 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.