Data Center 2 Bilbao Arasur

Data Center 2 Bilbao Arasur is an operational data center operated by Merlin Properties in Miranda de Ebro, Spain. Our footprint estimate of its power is about 61 MW.

Key facts

StatusOperational
OperatorMerlin Properties
Facility power61 MW (range 31 MW to 98 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 16,985 m² building outline x 3 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 26,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Also known asData Center 3 Bilbao Arasur
Coordinates42.69876, -2.90748

Satellite view

Questions

How much power does Data Center 2 Bilbao Arasur use?

We estimate the facility power at about 61 MW. Estimate from building footprint, low confidence.

Who operates Data Center 2 Bilbao Arasur?

Merlin Properties.