Level3 Mendoza
Level3 Mendoza is an operational data center operated by Lumen Technologies in Godoy Cruz, Argentina. Our footprint estimate of its power is about 0.8 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Lumen Technologies |
| Facility power | 0.8 MW (range 0.3 MW to 2 MW) Estimate from building footprint, low confidence. Footprint estimate: about 6,554 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 340 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Carril Rodríguez Peña 2331, 5501, Godoy Cruz |
| Coordinates | -32.92980, -68.81000 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Level3 Mendoza use?
We estimate the facility power at about 0.8 MW. Estimate from building footprint, low confidence.
Who operates Level3 Mendoza?
Lumen Technologies.
Data centers near Godoy Cruz
- Cirion Mendoza - MEN1 403 m
- Super Mendoza 5.9 km
- Telefonica POP Mendoza 6.0 km
- Cabase MZA 6.1 km
More Lumen Technologies data centers
- Level(3) Weehawken United States
- Level(3) Seattle (Denny Way) United States
- Level(3) Denver United States
- Level(3) London (Braham Street) United Kingdom
- Level(3) McLean United States
- Lumen Ashburn United States
- Level(3) Sunnyvale United States
- Level(3) Dallas United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.