Level3 Mendoza

Level3 Mendoza is an operational data center operated by Lumen Technologies in Godoy Cruz, Argentina. Our footprint estimate of its power is about 0.8 MW.

Key facts

StatusOperational
OperatorLumen Technologies
Facility power0.8 MW (range 0.3 MW to 2 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 6,554 m² site outline x 0.12 kW per m² of land.
GPU capacity if all AIabout 340 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressCarril Rodríguez Peña 2331, 5501, Godoy Cruz
Coordinates-32.92980, -68.81000

Satellite view

Questions

How much power does Level3 Mendoza use?

We estimate the facility power at about 0.8 MW. Estimate from building footprint, low confidence.

Who operates Level3 Mendoza?

Lumen Technologies.