Level(3) Denver is an operational data center operated by Lumen Technologies in Denver, United States. Our footprint estimate of its power is about 12 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Lumen Technologies |
| Facility power | 12 MW (range 6.2 MW to 20 MW) Estimate from building footprint, low confidence. Footprint estimate: about 3,422 m² building outline x 3 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 5,100 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 10 networks PeeringDB. |
| Also known as | Pearl Plaza Office Building |
| Address | 1850 Pearl |
| Coordinates | 39.74512, -104.97967 |
| Website | lumen.com |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Level(3) Denver use?
We estimate the facility power at about 12 MW. Estimate from building footprint, low confidence.
Who operates Level(3) Denver?
Lumen Technologies.
Data centers near Denver
- CoreSite - Denver (DE2) 51 m
- 1500 Champa 1.3 km
- CoreSite - Denver (DE1) 1.4 km · 20 MW
- Iron Mountain Data Center - Denver (DEN-1) 3.7 km
- CoreSite - Denver (DE3) 4.7 km
- Sungard AS Thornton 11.3 km
- ColoradoColo - Lakewood (LKWD) 12.4 km
- Flexential - Denver/Aurora (DEN03) 14.5 km
More Lumen Technologies data centers
- Level(3) Weehawken United States
- Level(3) Seattle (Denny Way) United States
- Level(3) London (Braham Street) United Kingdom
- Level(3) McLean United States
- Lumen Ashburn United States
- Level(3) Sunnyvale United States
- Level(3) Dallas United States
- Lumen Norristown United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.