Ionos data center in Worcester is an operational data center operated by Ionos in Worcester, United Kingdom. Our footprint estimate of its power is about 7.6 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Ionos |
| Facility power | 7.6 MW (range 3.8 MW to 12 MW) Estimate from building footprint, low confidence. Footprint estimate: about 6,321 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 3,200 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Opened | 2022 |
| Coordinates | 52.20590, -2.15669 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Ionos data center in Worcester use?
We estimate the facility power at about 7.6 MW. Estimate from building footprint, low confidence.
Who operates Ionos data center in Worcester?
Ionos.
Data centers near Worcester
- VeloxServ DC3 - Redditch 19.0 km
- Evoque Data Center Solutions 22.0 km · 11 MW
- Pulsant Birmingham WM-1 34.2 km
- Safehosts Cheltenham 35.3 km
- EE Data Centre 37.2 km · 5.2 MW
- Indectron GCR1 - Gloucester, Shield House 38.1 km
- Hutchison 3G 38.9 km · 6.3 MW
- Chubb Buildings 42.5 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.