Hutchison 3G
Hutchison 3G is an operational data center in Wednesbury, United Kingdom. Our footprint estimate of its power is about 6.3 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 6.3 MW (range 3.2 MW to 10 MW) Estimate from building footprint, low confidence. Footprint estimate: about 5,264 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 2,700 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | WS10 7WP, Wednesbury |
| Coordinates | 52.54730, -2.03056 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Hutchison 3G use?
We estimate the facility power at about 6.3 MW. Estimate from building footprint, low confidence.
Data centers near Wednesbury
- EE Data Centre 2.1 km · 5.2 MW
- Chubb Buildings 7.7 km
- VeloxServ DC1 - Wolverhampton 8.1 km
- Midlands Technology Centre 11.7 km
- Pulsant Birmingham WM-1 16.1 km
- VeloxServ DC3 - Redditch 27.1 km
- Evoque Data Center Solutions 28.0 km · 11 MW
- Entanet Telford DC3 29.8 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.