GAD-Rechenzentrum 2 is an operational data center operated by Atruvia in Münster, Germany. Our footprint estimate of its power is about 14 MW.

Key facts

StatusOperational
OperatorAtruvia
Facility power14 MW (range 7.2 MW to 23 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 11,992 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 6,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressStockholmer Straße 11, 48163, Münster
Opened2016
Coordinates51.89347, 7.59630

Satellite view

Questions

How much power does GAD-Rechenzentrum 2 use?

We estimate the facility power at about 14 MW. Estimate from building footprint, low confidence.

Who operates GAD-Rechenzentrum 2?

Atruvia.