Fiducia & GAD IT data center in Münster
Fiducia & GAD IT data center in Münster is an operational data center operated by Fiducia & GAD IT in Münster, Germany. Our footprint estimate of its power is about 17 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Fiducia & GAD IT |
| Facility power | 17 MW (range 8.3 MW to 27 MW) Estimate from building footprint, low confidence. Footprint estimate: about 13,855 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 7,300 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Feldstiege 110, 48161, Münster |
| Coordinates | 52.00524, 7.53863 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Fiducia & GAD IT data center in Münster use?
We estimate the facility power at about 17 MW. Estimate from building footprint, low confidence.
Who operates Fiducia & GAD IT data center in Münster?
Fiducia & GAD IT.
Data centers near Münster
- Rechenzentrum Citeq 6.0 km
- Servergebäude 6.2 km · 0.8 MW
- GLOBE Development Datacenter Münster 8.6 km
- 1&1 Versatel Telehaus Münster 10.9 km
- GAD-Rechenzentrum 2 13.0 km · 14 MW
- TKRZ Emsdetten (EMS1) 17.0 km
- TKRZ Greven (GRV1) 17.6 km
- DMO - Datacenter Münster Osnabrück (DMO1) 17.8 km · 0.7 MW