Equinix SY7 - Sydney (formerly Metronode Illawara 1)
Equinix SY7 - Sydney (formerly Metronode Illawara 1) is an operational data center operated by Equinix in Unanderra, Australia. Our footprint estimate of its power is about 1.4 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Equinix |
| Facility power | 1.4 MW (range 0.7 MW to 2.3 MW) Estimate from building footprint, low confidence. Footprint estimate: about 1,176 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 600 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 9 networks, 2 internet exchanges PeeringDB. |
| Also known as | Equinix SY7 - Sydney |
| Address | 8 Lathe Place |
| Coordinates | -34.46359, 150.85699 |
| Website | equinix.com/locations/asia-colocation/australia-colocation/sydney-data-centers/sy7 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Equinix SY7 - Sydney (formerly Metronode Illawara 1) use?
We estimate the facility power at about 1.4 MW. Estimate from building footprint, low confidence.
Who operates Equinix SY7 - Sydney (formerly Metronode Illawara 1)?
Equinix.
Data centers near Unanderra
- Southern Highlands Data Campus 45.0 km · 6.2 MW
- AWS Asia Pacific (Sydney) Region Data Centre 48.1 km · 25 MW
- AWS Asia Pacific (Sydney) Region Data Centre 48.3 km · 17 MW
- Equinix SY1/SY2 - Sydney 67.5 km · 32 MW
- Equinix SY4 - Sydney 67.9 km · 29 MW
- Vocus Sydney SYD01 68.4 km
- Equinix SY3 - Sydney 68.7 km · 29 MW
- SISDC1-SYD 70.1 km
More Equinix data centers
- Equinix DA1 - Dallas United States
- Equinix SP6 Brazil
- Equinix PH1 - Philadelphia United States
- Equinix PA13X France
- Equinix CH1/CH2/CH4 - Chicago United States
- Equinix CH3 - Elk Grove United States
- Equinix AM3 - Amsterdam, Science Park Netherlands
- Equinix LA1 - Los Angeles United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.