Equinix SY4 - Sydney
Equinix SY4 - Sydney is an operational data center operated by Equinix in Sydney, Australia. Our footprint estimate of its power is about 29 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Equinix |
| Facility power | 29 MW (range 15 MW to 47 MW) Estimate from building footprint, low confidence. Footprint estimate: about 12,124 m² building outline x 2 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 12,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 146 networks, 6 internet exchanges PeeringDB. |
| Also known as | Equinix SY5 - Sydney · Equinix SY5 · Equinix SY4 · Equinix SY5b |
| Address | Unit A, 200 Bourke Road, Alexandria |
| Coordinates | -33.91820, 151.18930 |
| Website | equinix.com/locations/asia-colocation/australia-colocation/sydney-data-centers/sy4 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Equinix SY4 - Sydney use?
We estimate the facility power at about 29 MW. Estimate from building footprint, low confidence.
Who operates Equinix SY4 - Sydney?
Equinix.
Data centers near Sydney
- Equinix SY1/SY2 - Sydney 425 m · 32 MW
- Vocus Sydney SYD01 527 m
- Equinix SY3 - Sydney 789 m · 29 MW
- SISDC1-SYD 2.2 km
- AAPT Glebe 3.9 km
- Intellicentre 1 (IC1) 4.5 km
- Optus Ultimo 4.5 km · 8.1 MW
- DigiCo Sydney SYD1 (formerly Global Switch Australia) 4.8 km · 76 MW
More Equinix data centers
- Equinix DA1 - Dallas United States
- Equinix SP6 Brazil
- Equinix PH1 - Philadelphia United States
- Equinix PA13X France
- Equinix CH1/CH2/CH4 - Chicago United States
- Equinix CH3 - Elk Grove United States
- Equinix AM3 - Amsterdam, Science Park Netherlands
- Equinix LA1 - Los Angeles United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.