Optus Ultimo

Optus Ultimo is an operational data center operated by Singtel Optus in Sydney, Australia. Our footprint estimate of its power is about 8.1 MW.

Key facts

StatusOperational
OperatorSingtel Optus
Facility power8.1 MW (range 4.1 MW to 13 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 1,694 m² building outline x 4 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 3,500 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks1 networks
PeeringDB.
Also known asOptus Data Centre
Address549 Harris St, Ultimo
Coordinates-33.87869, 151.19879
Websiteoptus.com.au

Satellite view

Questions

How much power does Optus Ultimo use?

We estimate the facility power at about 8.1 MW. Estimate from building footprint, low confidence.

Who operates Optus Ultimo?

Singtel Optus.