Equinix PE2/PE3 - Perth is an operational data center operated by Equinix in Shenton Park, Australia. Our footprint estimate of its power is about 2.2 MW.

Key facts

StatusOperational
OperatorEquinix
Facility power2.2 MW (range 1.1 MW to 3.5 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 1,841 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 940 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks43 networks, 4 internet exchanges
PeeringDB.
Also known asEquinix PE2
AddressFY 11 37 Lemnos St, Shenton Park WA 6008
Coordinates-31.95509, 115.79642
Websiteequinix.com/data-centers/asia-pacific-colocation/australia-colocation/perth-data-centers/pe3

Satellite view

Questions

How much power does Equinix PE2/PE3 - Perth use?

We estimate the facility power at about 2.2 MW. Estimate from building footprint, low confidence.

Who operates Equinix PE2/PE3 - Perth?

Equinix.