Equinix data center - ST4
Equinix data center - ST4 is an operational data center operated by Equinix in Melipilla, Chile. Our footprint estimate of its power is about 3.2 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Equinix |
| Facility power | 3.2 MW (range 1.6 MW to 5.1 MW) Estimate from building footprint, low confidence. Footprint estimate: about 2,653 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 1,400 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | -33.95616, -71.39971 |
| Website | equinix.lat |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Equinix data center - ST4 use?
We estimate the facility power at about 3.2 MW. Estimate from building footprint, low confidence.
Who operates Equinix data center - ST4?
Equinix.
Data centers near Melipilla
- Equinix ST4 - Santiago 60.1 km
- NextStream Data Center 62.2 km · 3.7 MW
- Amazon Web Services 70.1 km · 4.8 MW
- Equinix data center 75.9 km · 3.1 MW
- Equinix ST1/ST2 - Santiago 76.1 km
- IBM data center / Centro Tecnológico San Bernardo 77.8 km · 1.6 MW
- Odata Data Center 79.4 km · 14 MW
- Data Center L7 85.3 km · 0.6 MW
More Equinix data centers
- Equinix DA1 - Dallas United States
- Equinix SP6 Brazil
- Equinix PH1 - Philadelphia United States
- Equinix PA13X France
- Equinix CH1/CH2/CH4 - Chicago United States
- Equinix CH3 - Elk Grove United States
- Equinix AM3 - Amsterdam, Science Park Netherlands
- Equinix LA1 - Los Angeles United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.