Data Center L7 is an operational data center in Renca, Chile. Our footprint estimate of its power is about 0.6 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 0.6 MW (range 0.3 MW to 1 MW) Estimate from building footprint, low confidence. Footprint estimate: about 532 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 260 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | -33.41024, -70.75238 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Data Center L7 use?
We estimate the facility power at about 0.6 MW. Estimate from building footprint, low confidence.
Data centers near Renca
- GTD Chile - Panamericana 6.4 km
- Data Center GTD 6.5 km · 3.1 MW
- SONDA - Quilicura 7.8 km · 2.1 MW
- Google Data Center 7.9 km · 18 MW
- Ascenty SCL01 - Santiago 9.1 km
- Cirion Santiago de Chile - SAN1 9.1 km · 1.2 MW
- Ascenty SCL02 - Santiago 9.2 km
- Campus Santiago Ascenty Data Center 9.3 km · 11 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.