Data Center Directory

Equinix CH7 - Westmont

Equinix CH7 - Westmont is an operational data center operated by Equinix in Westmont, United States. Our footprint estimate of its power is about 4.3 MW.

Key facts

StatusOperational
OperatorEquinix
Facility power4.3 MW (range 2.1 MW to 6.9 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 3,580 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 1,800 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks3 networks
PeeringDB.
Also known asEquinix Chicago Data CH7
Address111 Plaza Dr
Coordinates41.81260, -87.97283
Websiteequinix.co.uk/data-centers/americas-colocation/united-states-colocation/chicago-data-centers/ch7

Satellite view

Questions

How much power does Equinix CH7 - Westmont use?

We estimate the facility power at about 4.3 MW. Estimate from building footprint, low confidence.

Who operates Equinix CH7 - Westmont?

Equinix.

Data centers near Westmont

More Equinix data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.