Equinix BX1 - Bordeaux is an operational data center operated by Equinix in Bruges, France. Our footprint estimate of its power is about 3.4 MW.

Key facts

StatusOperational
OperatorEquinix
Facility power3.4 MW (range 1.4 MW to 8.6 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 28,658 m² site outline x 0.12 kW per m² of land.
GPU capacity if all AIabout 1,500 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks9 networks, 1 internet exchanges
PeeringDB.
Also known asEquinix
Address39 Rue de Strasbourg
Coordinates44.89582, -0.61139
Websiteequinix.com/data-centers/europe-colocation/france-colocation/bordeaux-data-centers/bx1

Satellite view

Questions

How much power does Equinix BX1 - Bordeaux use?

We estimate the facility power at about 3.4 MW. Estimate from building footprint, low confidence.

Who operates Equinix BX1 - Bordeaux?

Equinix.