Aliénor.net
Aliénor.net is an operational data center operated by Alienor.net in Le Bouscat, France. Our footprint estimate of its power is about 0.6 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Alienor.net |
| Facility power | 0.6 MW (range 0.3 MW to 1 MW) Estimate from building footprint, low confidence. Footprint estimate: about 511 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 260 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 44.87399, -0.59791 |
| Website | groupe-aquitem.fr |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Aliénor.net use?
We estimate the facility power at about 0.6 MW. Estimate from building footprint, low confidence.
Who operates Aliénor.net?
Alienor.net.
Data centers near Le Bouscat
- Equinix BX1 - Bordeaux 2.6 km · 3.4 MW
- Cogent Bordeaux 3.5 km
- UltraEdge Bordeaux 3.6 km
- SFR Netcenter Bordeaux 3.7 km · 8.7 MW
- TDF Datacenter Bordeaux Bouliac 9.5 km
- EXA Edge DC Bordeaux 11.4 km · 1.3 MW
- Bouygues Télécom data center in Léognan 17.5 km · 1.8 MW
- EXA Edge DC Ychoux 66.3 km
Sources
Correct this page or get the data