Envision Galaxy Ulanqab

Envision Galaxy Ulanqab is an operational data center that is still expanding, in Ulanqab, China. Its power is about 153 MW, growing to about 612 MW by 2027-12. Epoch AI estimates about 48,000 H100-equivalent AI chips (Ascend 950PR).

Power demand is growing at this site

Key facts

StatusOperational, expanding
Facility power153 MW
Reported (Epoch AI or owner data)
IT power118 MW
Planned power612 MW by 2027-12-01
Epoch AI timeline projection.
AI compute48,000 H100-equivalents → 170,000 planned
AI chipsAscend 950PR
Reported (Epoch AI or owner data)
GPU capacity if all AIabout 66,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Capital costUSD 4.5 billion → 17.8 billion planned
Epoch AI estimate, 2025 USD.
Coordinates40.99027, 113.13156 (city level)

Build timeline

DatePowerH100eWhat the satellite images and filings show
2025-08-0100Land clearing begins for Building 1.
2026-05-1100Building 2 is under construction.
2026-08-0600Building 1 being [commissioned](https://www.prnewswire.com/news-releases/envision-commissions-galaxy-campus-in-ulanqab-establishing-a-new-model-for-gigawatt-scale-ai-infrastructure-302844834.html), Building 3 under construction
2026-09-0500Land clearing begins for Building 4.
2026-11-01153 MW48,000Building 1 expected to be fully operational, assuming a 3-month fit-out period
2027-07-01 (projected)306 MW89,000Building 2 expected to be fully operational, assuming a 3-month fitout period after taking one year from land clearing to commissioning, as demonstrated by Building 1. Similarly. Building 3 is expected to be commissioned now.
2027-12-01 (projected)612 MW170,000Building 4 expected to be fully operational, assuming a 3-month fitout period after taking one year from land clearing to commissioning as demonstrated by Building 1.

Source: Epoch AI Frontier Data Centers.

Chip deployments

DateChipUnitsBasis
2026-11-01Ascend 950PR94,856Estimate
2027-07-01Ascend 950DT33,010Estimate
2027-07-01Ascend 950PR142,283Estimate
2027-12-01Ascend 950DT99,029Estimate
2027-12-01Ascend 950PR237,139Estimate

Satellite view

Questions

How much power does Envision Galaxy Ulanqab use?

Public data puts the facility power at about 153 MW, with about 612 MW planned by 2027. Reported (Epoch AI or owner data).

What chips does Envision Galaxy Ulanqab use?

Reported chips: Ascend 950PR.