Data center in Jining
Data center in Jining is an operational data center in Jining, China. Our footprint estimate of its power is about 36 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 36 MW (range 15 MW to 91 MW) Estimate from building footprint, low confidence. Footprint estimate: about 302,337 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 15,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 41.04725, 113.15930 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Data center in Jining use?
We estimate the facility power at about 36 MW. Estimate from building footprint, low confidence.
Data centers near Jining
- Data center in Jining 891 m · 15 MW
- Envision Galaxy Ulanqab 6.8 km · 153 MW
- 乌兰察布华为云数据中心 8.5 km · 4.3 MW
- Data center in Ulanqab 9.0 km · 9.7 MW
- Data center in Ulanqab 9.2 km · 24 MW
- Data center in Ulanqab 9.6 km · 22 MW
- Data center in Ulanqab 9.7 km · 14 MW
- 阿里巴巴乌兰察布数据中心 10.0 km · 20 MW