Data Center Directory

EdgeConneX data center in Oosteinde

EdgeConneX data center in Oosteinde is an operational data center operated by EdgeConneX in Oosteinde, Netherlands. Our footprint estimate of its power is about 6.9 MW.

Key facts

StatusOperational
OperatorEdgeConneX
Facility power6.9 MW (range 3.4 MW to 11 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 5,743 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 2,900 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Also known asEdgeConneX AMS01 · EdgeConneX AMS03
Opened2000
Coordinates52.28386, 4.76606

Satellite view

Questions

How much power does EdgeConneX data center in Oosteinde use?

We estimate the facility power at about 6.9 MW. Estimate from building footprint, low confidence.

Who operates EdgeConneX data center in Oosteinde?

EdgeConneX.

Data centers near Oosteinde

More EdgeConneX data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.