Data Center Directory

EcoDataCenter

EcoDataCenter is a data center under construction in Borlänge, Sweden. Our footprint estimate of its power is about 97 MW.

Power demand is growing at this site

Key facts

StatusUnder construction
Facility power97 MW (range 39 MW to 242 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 807,650 m² site outline x 0.12 kW per m² of land.
GPU capacity if all AIabout 41,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates60.52177, 15.42052

Satellite view

Questions

How much power does EcoDataCenter use?

We estimate the facility power at about 97 MW. Estimate from building footprint, low confidence.

Data centers near Borlänge

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.