EcoDataCenter 2

EcoDataCenter 2 is a data center under construction operated by Mistral AI in Borlänge, Sweden. No power figure is public for this site yet.

Power demand is growing at this site

Key facts

StatusUnder construction
OperatorMistral AI
UsersMistral AI
Planned power67 MW by 2028-06-30
Epoch AI timeline projection.
AddressKvarnsvedsvägen 420, 784 66 Borlänge, Sweden
Coordinates60.52514, 15.41381

Build timeline

DatePowerH100eWhat the satellite images and filings show
2025-09-0100Land clearing begins. [EcoDataCenter](https://ecodatacenter.tech/press/ecodatacenter-breaks-ground-on-mega-campus-in-borlnge-3406556) announces on September 24th that construction has started on EcoDataCenter 2, so we model it as started from the beginning of the month.
2026-05-0900Buildings 1 and 2 still under construction. The first two building shells are visibly well into construction, with lots of additional ground work visible all across the campus. Based on high-resolution satellite imagery from this date.
2026-08-1700Buildings 1 and 2 look fully roofed, with active construction showing cooling and power equipment still being installed. Buildings 3-4 look like their foundations have been laid out and are early in construction.
2027-06-30 (projected)34 MW69,000Buildings 1-2 operational. Based on [Bravida](https://www.bravida.se/en/press/press-releases/2026/bravida-carries-out-installations-in-two-data-centres-for-around-sek-200-million/) stating that installation work in two EcoDataCenter data centers in Borlänge is expected to be completed by mid-2027, together with [EcoDataCenter Annual Report 2025](https://ecodatacenter.tech/hubfs/Annual%20Report%202025_EcoDC%20Holding%20AB_ENG.pdf) identifying B1 and B2 as the first two buildings under construction.
2028-06-30 (projected)67 MW139,000Buildings 3-4 operational. Based on [Bravida](https://www.bravida.se/en/press/press-releases/2026/bravida-awarded-sek-650-million-installation-contract-in-borlange-by-ecodatacenter/) stating that installation work in another EcoDataCenter data center continues through Q1 2028, combined with permit documentation showing four data center buildings under construction by May 2026.

Source: Epoch AI Frontier Data Centers.

Satellite view

Questions

Who operates EcoDataCenter 2?

Mistral AI. Reported users: Mistral AI.