DCA | Pier DC Tier III
DCA | Pier DC Tier III is an operational data center operated by DC Alliance in Perth, Australia. Our footprint estimate of its power is about 7 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | DC Alliance |
| Facility power | 7 MW (range 3.5 MW to 11 MW) Estimate from building footprint, low confidence. Footprint estimate: about 5,866 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 3,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 5 networks, 1 internet exchanges PeeringDB. |
| Also known as | Pier Data Centre |
| Address | 1 Martin Place, Canning Vale |
| Coordinates | -32.05965, 115.91607 |
| Website | dcalliance.com.au |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does DCA | Pier DC Tier III use?
We estimate the facility power at about 7 MW. Estimate from building footprint, low confidence.
Who operates DCA | Pier DC Tier III?
DC Alliance.
Data centers near Perth
- Data center in East Victoria Park 7.5 km · 2.8 MW
- Pawsey Supercomputing Centre Setonix 8.0 km · 0.8 MW
- Telstra 10.8 km
- PureColo PER01 (Perth) 11.8 km
- aCure 12.7 km
- Equinix PE1 - Perth 12.8 km
- Vocus Perth PER01 12.9 km
- NEXTDC P2 13.0 km · 48 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.