DC Free
DC Free is an operational data center operated by Illiad in Gerzat, France. Our footprint estimate of its power is about 1.5 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Illiad |
| Facility power | 1.5 MW (range 0.8 MW to 2.4 MW) Estimate from building footprint, low confidence. Footprint estimate: about 1,276 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 640 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 45.83322, 3.13704 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does DC Free use?
We estimate the facility power at about 1.5 MW. Estimate from building footprint, low confidence.
Who operates DC Free?
Illiad.
Data centers near Gerzat
- Datacenter IBM 357 m · 2.3 MW
- Nexeren CBZ 1.7 km · 0.9 MW
- Datacenter IBM 2.9 km · 4.2 MW
- Datacenter IBO 5.5 km · 1.7 MW
- Centre Régional de Ressources Informatiques (CRRI) 8.1 km · 2.7 MW
- RTDC 8.3 km
- O2Switch DC2 8.5 km · 2.6 MW
- MXTL1 45.2 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.